01
Name the fitting
State elbow, tee, reducing tee, concentric reducer, eccentric reducer, cap, stub end, or forged fitting.

RTI procurement resource
A piping fitting RFQ needs more than an alloy name and nominal size. This guide organizes geometry, product route, connecting pipe dimensions, schedule or wall, end preparation, dimensional basis, quantity, inspection, documentation, marking, packing, and destination details so elbows, tees, reducers, caps, stub ends, and forged fittings can be reviewed against the intended piping requirement.
Working method
Use the checklist to create a technical record before issuing the RFQ.
Working method
Technical checklist
State the exact component, including equal or reducing tee and concentric or eccentric reducer.
Confirm NPS, OD, wall or schedule, bore, bevel, socket weld, threaded, or drawing-controlled ends.
State ASME B16.9, ASME B16.11, or the project drawing rather than assuming equivalent geometry.
Name any PMI, IGC, NACE, NDE, MTC, TPI, marking, and release-document requirements.
Document controls
Request it when centre-to-end, wall, bevel, bore, reducer orientation, or drawing dimensions require evidence.
Match the certificate grade, product form, standard, test results, and heat number to finished item markings.
Define protection for bevels or machined surfaces, segregation, crate marking, and destination documentation.
Buyer questions
Ready to define an order?
Use the advanced RFQ to capture the component, material, standards, dimensions, inspection, documents, packing, and destination requirements in one reviewable form.
Technical quotation desk
Send us your material grade, size, class or schedule, quantity, and specification.