01
Describe the service
Capture medium, concentration or contaminants where relevant, phases, flow, deposits, chlorides, hydrogen sulfide, cleaning, and external exposure.

RTI procurement resource
A useful material-selection brief starts with the service condition, not a preferred alloy label. This guide helps procurement teams assemble the process medium, contaminants, temperature, pressure, corrosion concern, product form, dimensional route, standards, inspection, and certificate controls that a qualified engineering review requires, while preserving the distinction between an early screening comparison and project approval.
Working method
Use the checklist to create a technical record before issuing the RFQ.
Working method
Technical checklist
Internal medium, external exposure, contaminants, concentration, velocity, deposits, and cleaning.
Temperature, pressure, cycles, flange class, facing, bore, schedule, and drawing-controlled geometry.
Product form, welding or fabrication route, heat treatment or condition where applicable, and inspection plan.
Responsible engineering decision, substitution control, certificate, PMI, TPI, and release documentation.
Document controls
Keep the approved material basis connected to the project revision and purchase order.
Use tool output as a discussion aid, not as approval for a particular installation.
Carry the final material decision into UNS, standard, inspection, testing, marking, packing, and documentation controls.
Related buyer tools
Buyer questions
Ready to define an order?
Use the advanced RFQ to capture the component, material, standards, dimensions, inspection, documents, packing, and destination requirements in one reviewable form.
Technical quotation desk
Send us your material grade, size, class or schedule, quantity, and specification.