01
Frame the requirement
Start with product, material, standard, size, pressure or bore, quantity, service context, and destination.

RTI procurement resource
This procurement FAQ answers the practical questions that commonly arise before requesting a technical quotation for alloy flanges, pipe fittings, and drawing-defined components. It points buyers toward the material, dimensional, standards, inspection, documentation, packing, and logistics details that make a request easier to review, while avoiding unapproved promises on availability, compliance, test scope, or suitability.
Working method
Use the checklist to create a technical record before issuing the RFQ.
Working method
Technical checklist
Type, NPS, class, facing, bore, material, standard, inspection, and documents.
Form, dimensions, schedule or wall, ends, material route, standard, and quality scope.
MTC or EN 10204 3.1 requirement, heat traceability, PMI, and project additions.
Quantity, packing, shipping marks, destination, target date, and export documents.
Document controls
It governs order-specific requirements and should be issued by revision.
It supports traceability but should be reconciled with the product, heat, and required standard.
Collect inspection, certificate, marking, packing, and shipping documents in a controlled package.
Related buyer tools
Buyer questions
Ready to define an order?
Use the advanced RFQ to capture the component, material, standards, dimensions, inspection, documents, packing, and destination requirements in one reviewable form.
Technical quotation desk
Send us your material grade, size, class or schedule, quantity, and specification.