01
Environment
Offshore floating production, processing, storage, and utility systems

RTI industry authority
FPSO projects combine offshore exposure with process equipment, utilities, seawater, produced fluids, limited storage, module interfaces, and strict project controls. RTI helps procurement teams define the component in full: service, material route, pressure class, facing, bore, standards, inspection plan, certificates, preservation, packing, and delivery condition are all visible before quotation.
Quick engineering snapshot
These controlled signals help start a technical conversation. Final component and alloy approval stays with the governing project specification and responsible engineering authority.
| Specification | Verified value | Unit |
|---|---|---|
| Environment | Offshore floating production, processing, storage, and utility systems | - |
| Corrosion focus | Marine chlorides, produced-water chemistry, process contaminants, crevice geometry, wet-dry cycling, and galvanic interfaces are reviewed by service and location. | - |
| Temperature consideration | Process temperature, thermal cycles, insulation, ambient marine exposure, and start-up or shutdown conditions should accompany the RFQ. | - |
| Pressure and containment | Piping class, pressure class, joint type, facing, bore, gasket, bolting, and module connection data must be consistent with the approved design basis. | - |
| Common component route | FPSO module piping class, pressure class, facing, gasket, and joint details / line schedule or bore, end preparation, reducer geometry, and installation orientation | - |
Operating environment
The technical environment map keeps corrosion, temperature, pressure, product details, inspection, and documentation in the same decision path.
Technical environment map
01
Offshore floating production, processing, storage, and utility systems
02
Marine chlorides, produced-water chemistry, process contaminants, crevice geometry, wet-dry cycling, and galvanic interfaces are reviewed by service and location.
03
Process temperature, thermal cycles, insulation, ambient marine exposure, and start-up or shutdown conditions should accompany the RFQ.
04
Piping class, pressure class, joint type, facing, bore, gasket, bolting, and module connection data must be consistent with the approved design basis.
05
Specification, inspection, traceability, and delivery documentation
Corrosion and temperature
Corrosion performance changes with the actual medium, temperature, geometry, fabrication, and operating conditions. The alloy name does not replace service-specific engineering review.
Marine chlorides, produced-water chemistry, process contaminants, crevice geometry, wet-dry cycling, and galvanic interfaces are reviewed by service and location.
Process temperature, thermal cycles, insulation, ambient marine exposure, and start-up or shutdown conditions should accompany the RFQ.
Crevices, stagnant zones, weld details, insulation interfaces, gasket selection, and cleaning practice should be reviewed alongside the nominal alloy grade.
Commonly considered alloys
These material pages provide technical information. They are not a substitute for the project material selection process or an approved substitution.
Super duplex benchmark for chloride-rich and seawater-related applications.
Nickel alloy benchmark for severe corrosion, seawater, and elevated-temperature review.
Low-carbon molybdenum-bearing stainless benchmark for controlled process service.
Flanges and pipe fittings
For each component, keep material, product-form standard, dimensional standard, pressure class, facing, bore or schedule, testing, and document release separated and clear.
Flange selection should confirm FPSO module piping class, pressure class, facing, gasket, and joint details, pressure class, facing, bore, gasket system, bolting, machining, and any drawing-controlled details before quotation.
Elbows, tees, reducers, caps, stub ends, and forged fittings should align line schedule or bore, end preparation, reducer geometry, and installation orientation before a purchase order is released.
Material grade, product-form standard, dimensional standard, inspection plan, marking, packing, and document release are separate controls. They should be written separately in the RFQ.
Relevant standards
Product material standard, component dimensional standard, test-certificate route, and project specification each answer a different procurement question.
Flange size, class, facing, and RFQ controls.
Buttwelding fitting dimensions and procurement controls.
Sour-service review and order-specific documentation control.
Heat number, MTC, PMI, marking, and dossier control.
Quality and inspection
PMI, MTC, EN 10204 3.1, TPI attendance, test records, markings, and release documentation should be aligned with the actual project and ordered product form.
Define the PMI method, sampling plan, acceptance criteria, and record format when alloy identity is critical to the service or project quality plan.
Request MTC and EN 10204 3.1 documentation when manufacturer-issued inspection records are required, then reconcile heat number, grade, product form, standard, test results, and final marking.
Agree the ITP, PMI scope, document review gates, marking, preservation, packing, and any EPC or TPI attendance before manufacturing starts.
Project-specific material, NDE, pressure, corrosion, and dossier requirements must be stated against the order line and approved ITP.
Procurement guidance
A complete enquiry reduces clarification cycles and makes inspection, documentation, packing, and delivery expectations visible from the start.
State the fluid or process medium, concentration or contaminants where relevant, design and upset temperatures, design pressure, corrosion allowance, and governing project specification. Final material selection remains an engineering approval.
Capture module, line, tag, material, connection, documents, packing, lifting or protection needs, shipment sequence, and destination details in the RFQ.
Agree document requirements, review points, TPI attendance where required, marking, protective facing covers, packing method, and destination requirements before production release.
Do not treat similar alloy names as interchangeable. Any substitution needs the engineering authority to compare service, product standard, dimensions, tests, and documentation requirements.
Related RTI pathways
Use material data pages, product pages, and engineering guides together when preparing a technical quotation.
Super duplex benchmark for chloride-rich and seawater-related applications.
Nickel alloy benchmark for severe corrosion, seawater, and elevated-temperature review.
Low-carbon molybdenum-bearing stainless benchmark for controlled process service.
Engineering FAQs
Answers frame the information that belongs in the RFQ and do not replace formal design review or the project specification.
Structured RFQ
Capture material, standard, dimensions, quantity, inspection, documentation, packing, and destination before the technical quotation is prepared.
Technical quotation
Share the service context, material, product, dimensions, pressure class, facing, testing, documents, destination, and drawing or datasheet details. RTI will use the information to structure the technical quotation pathway.
Technical quotation desk
Send us your material grade, size, class or schedule, quantity, and specification.