Engineered for Critical Industries. Trusted for Global Supply.
Raymond Tube Industries logoRaymond Tube IndustriesISO 9001:2015 Certified — Consistent Quality. Global Standards. Trusted Supply.
Illustrative modern offshore production platform with process modules and installed piping

RTI industry authority

Alloy Flanges and Fittings for Gas Processing

Gas processing equipment can combine acid gases, condensate, water, solids, dehydration media, compression, and high-pressure piping classes. RTI helps procurement teams capture the service description, design conditions, alloy requirement, standards, inspection, testing, certificates, and destination details that turn a generic enquiry into a technically reviewable request.

Quick engineering snapshot

Service context before material selection.

These controlled signals help start a technical conversation. Final component and alloy approval stays with the governing project specification and responsible engineering authority.

Gas Processing operating profile
SpecificationVerified valueUnit
EnvironmentSeparation, dehydration, compression, treatment, and transfer systems-
Corrosion focusCarbon dioxide, hydrogen sulfide, chlorides, free water, condensate, solids, deposits, and local geometry should be assessed as part of the corrosion review.-
Temperature considerationTemperature ranges, Joule-Thomson effects, compression heat, start-up and shutdown cases, and insulation condition may change the material and sealing review.-
Pressure and containmentConfirm the piping class, pressure class, facing, gasket, bore, schedule, and compatible mating connection against the approved design basis.-
Common component routegas-service piping class, pressure class, facing, and gasket selection / line bore, schedule, end preparation, and fitting configuration-

Operating environment

The component is only as well specified as the service around it.

The technical environment map keeps corrosion, temperature, pressure, product details, inspection, and documentation in the same decision path.

Technical environment map

Process-system envelope

01

Environment

Separation, dehydration, compression, treatment, and transfer systems

02

Corrosion

Carbon dioxide, hydrogen sulfide, chlorides, free water, condensate, solids, deposits, and local geometry should be assessed as part of the corrosion review.

03

Temperature

Temperature ranges, Joule-Thomson effects, compression heat, start-up and shutdown cases, and insulation condition may change the material and sealing review.

04

Pressure

Confirm the piping class, pressure class, facing, gasket, bore, schedule, and compatible mating connection against the approved design basis.

05

Release

Specification, inspection, traceability, and delivery documentation

Corrosion and temperature

Review the mechanism, then confirm the material route.

Corrosion performance changes with the actual medium, temperature, geometry, fabrication, and operating conditions. The alloy name does not replace service-specific engineering review.

Mechanism first

Carbon dioxide, hydrogen sulfide, chlorides, free water, condensate, solids, deposits, and local geometry should be assessed as part of the corrosion review.

Temperature changes the decision

Temperature ranges, Joule-Thomson effects, compression heat, start-up and shutdown cases, and insulation condition may change the material and sealing review.

Geometry and fabrication matter

Crevices, stagnant zones, weld details, insulation interfaces, gasket selection, and cleaning practice should be reviewed alongside the nominal alloy grade.

Commonly considered alloys

Comparison paths for an informed specification review.

These material pages provide technical information. They are not a substitute for the project material selection process or an approved substitution.

Flanges and pipe fittings

Connection details control the commercial outcome.

For each component, keep material, product-form standard, dimensional standard, pressure class, facing, bore or schedule, testing, and document release separated and clear.

Flanges

Flange selection should confirm gas-service piping class, pressure class, facing, and gasket selection, pressure class, facing, bore, gasket system, bolting, machining, and any drawing-controlled details before quotation.

Pipe fittings

Elbows, tees, reducers, caps, stub ends, and forged fittings should align line bore, schedule, end preparation, and fitting configuration before a purchase order is released.

Material route

Material grade, product-form standard, dimensional standard, inspection plan, marking, packing, and document release are separate controls. They should be written separately in the RFQ.

Relevant standards

Use the right document for the right control.

Product material standard, component dimensional standard, test-certificate route, and project specification each answer a different procurement question.

Quality and inspection

Traceability belongs in the RFQ, not at dispatch.

PMI, MTC, EN 10204 3.1, TPI attendance, test records, markings, and release documentation should be aligned with the actual project and ordered product form.

PMI and grade segregation

Define the PMI method, sampling plan, acceptance criteria, and record format when alloy identity is critical to the service or project quality plan.

Material certificates

Request MTC and EN 10204 3.1 documentation when manufacturer-issued inspection records are required, then reconcile heat number, grade, product form, standard, test results, and final marking.

Inspection plan

The ITP should clearly identify grade verification, certificate review, dimensional checks, marking, packing, and any purchaser or TPI hold points.

Order-specific testing

Specify required testing by the project and material standard, including any sour-service-related review, rather than expecting it from the component label.

Procurement guidance

Build an RFQ an engineer can approve.

A complete enquiry reduces clarification cycles and makes inspection, documentation, packing, and delivery expectations visible from the start.

Design basis

State the fluid or process medium, concentration or contaminants where relevant, design and upset temperatures, design pressure, corrosion allowance, and governing project specification. Final material selection remains an engineering approval.

Commercial scope

Include the fluid description, water and sour-service information where relevant, piping class, material restrictions, documents, witness points, and delivery condition.

Document release

Agree document requirements, review points, TPI attendance where required, marking, protective facing covers, packing method, and destination requirements before production release.

No unapproved substitution

Do not treat similar alloy names as interchangeable. Any substitution needs the engineering authority to compare service, product standard, dimensions, tests, and documentation requirements.

Engineering FAQs

Common gas processing procurement questions.

Answers frame the information that belongs in the RFQ and do not replace formal design review or the project specification.

Which alloy family is commonly reviewed for gas processing components?

The correct family depends on the process medium, chlorides or sulfur-bearing species where relevant, temperature, pressure, corrosion mechanism, product form, and project standard. Use the alloy links on this page as starting points, then obtain engineering approval for the specified service.

Is NACE MR0175 / ISO 15156 automatically applicable to every gas-processing order?

No. Applicability depends on the project service definition and owner requirements. State the required standard and acceptance route in the RFQ so it can be reviewed against the ordered product form and material.

Which documents should be included with a critical alloy order for Gas Processing?

The RFQ should state the certificate type, heat traceability, PMI record, inspection points, dimensional report, test records, marking requirement, packing requirements, and any third-party inspection or client release requirement.

Can RTI accept drawing-based flange and fitting enquiries for Gas Processing?

Yes. Include the drawing revision, material callout, product-form standard, dimensional standard, size, schedule or bore, pressure class, facing, quantity, testing, documents, destination, and any project-specific requirements in the RFQ.

Structured RFQ

Prepare a cleaner component enquiry

Capture material, standard, dimensions, quantity, inspection, documentation, packing, and destination before the technical quotation is prepared.

Start RFQ

Technical quotation

Define your gas processing component package.

Share the service context, material, product, dimensions, pressure class, facing, testing, documents, destination, and drawing or datasheet details. RTI will use the information to structure the technical quotation pathway.

Technical quotation desk

Have a Technical Requirement?

Send us your material grade, size, class or schedule, quantity, and specification.